Fitting it yourself.
Installation is a simple affair. Plan it early, run one cable, fit the nodes and switch on.
1. Plan where each node lives
Start by deciding where your nodes will go. Base it on where you want switches, or where things like the water pump live.
The cable is one continuous run, so plan this as early as you can. You want it in before cupboards and panels go up and get in the way.
2. Run the cable
Run the CAN bus cable along your planned route, from the command centre to each node in turn.
Think about power at the same time. You can run a suitably sized power cable alongside the CAN bus cable to feed the nodes. Some nodes need their own supply, though. The lights node, for example, powers the lights wired to it, so it needs a feed sized for that load.
3. Fit each node
Find a mounting spot for each node and tap it into the CAN bus cable. Splice connectors are fine for this. CAN bus is forgiving, so while a splice isn't the perfect joint, it's more than adequate here.
Fit a terminator at each end of the CAN bus cable. Don't skip this step.
4. Switch on
Power up and the nodes start talking to each other. If you have separate controls nodes, a little configuration matches each input to the thing it controls.
The command centre is the easiest way to check the install. Nodes appear automatically as devices in Home Assistant, so you can start using them straight away.
The exact cable, connectors and fusing will be published with the hardware.